Building Permit Application

  1. port-isabel(BUILDING)(1200)

  2. PLEASE READ BEFORE CONTINUING:

  3. REQUIRED Documents with Application for Permit Approval

    1. General Contractors – Must be insured with Certificate on File. 2. Plumbers, Electricians, Mechanical Contractors – Copy of Current license must be summited if not on file. 3. All Contractors are required to have liability insurance or Bond for the City of Port Isabel. 4. One set of paper construction plans with site plan- will become property of the City of Port Isabel. 5. WPI-1 Windstorm application required with permit application. APPLICATION WILL NOT BE ACCEPTED UNLESS ACCOMPANIED BY ALL REQUIRED MATERIALS.

  4. REQUIRES Documentation During Inspection Process

    a. A sanitation closet (Port-A-Potty) must be on premises at start of the site preparation. b. Allied Waste Roloff container must be on site. Submit copy of Contract to City Hall. c. Water meter must be connected for Rough In Inspection. Submit copy of water receipt to City Hall. d. A foundation survey stamped by RPLS hardcopy must be submitted PRIOR to foundation pour. e. Foundation Insp. WILL NOT be conducted until all documents are submitted to City Hall & all permits are signed. f. Elevation Certificate from FEMA must be submitted for all new construction and/or additions.

  5. OFFICIAL USE ONLY:

  6. CONTRACTOR:

  7. OWNER(S):

  8. ARCHITECT:

  9. ENGINEER:

  10. PROPERTY DESCRIPTION:

  11. LOT SIZE:

  12. PROJECT TYPE:*

  13. ROOF:*

  14. ELECTIRCAL:*

  15. Include # of circuits.

  16. PLUMBING:*

  17. Include quantities for: Bathrooms, Lavatories, Kitchens, Water Heaters, or Other

  18. Seawalls, boat docks, boat house, dredging and fill.

    The Army Corps of Engineers requires permits for seawalls, boat docks, boat house, dredging and fill.

  19. VALIDITY OF PERMIT:

    The issuance of granting of a permit or approval of plans, specifications, and computations shall not be construed to be a permit for, or an approval of, any violation of any provision of the codes or of any other city ordinance. Any permit presuming to give authority to violate or cancel any provision of the codes or any other city ordinance shall not be valid. The issuance of a permit based on plans, specifications, computations, and other data shall not prevent the building official from later requiring the correction of errors in plans, specifications computations, and other data or from preventing building operations being carried on when in violation of the codes or of any other city ordinance.

  20. NOTICE:

    Separate permits are required for Electrical, Plumbing, Heating, Ventilating or Air Conditioning. Electrical service main disconnects shall be located to the outside of all buildings. This application is not complete until accompanied by all required materials. Review will start when application is completed. I hereby certify that I have read and examined this application and know the same to be true and correct.